As Ananti's projects expanded simultaneously and the brand evolved into a distinctive lifestyle platform, the need emerged for a new headquarters that could embody its identity and vision. Conceived as more than a conventional office building, the project sought to accommodate diverse programs and activities while translating the brand's evolving direction into an architectural expression.
Located within the dense and fragmented urban fabric of Nonhyeon-dong, the site is surrounded by buildings of varying scales and architectural languages, with little sense of a coherent urban context. In response, the façade was composed of vertical metal louvers, aluminum panels, and U-shaped glass blocks, establishing a restrained yet distinctive architectural identity. Terraces and planting are integrated between the façade elements, introducing depth and variation to the building envelope. The deep terraces also provide passive shading while creating outdoor spaces that engage directly with the surrounding city.
To maximize the potential of the constrained urban site, advanced excavation and retaining-wall construction methods were considered from the earliest design stages, allowing the building to extend five levels below ground. A generous sunken courtyard reaching the third basement level introduces natural light and an outdoor connection into the lower floors, enabling these levels to function as usable and comfortable workspaces.
At the heart of the building, an open vertical void extends from the ground floor to the uppermost level. This continuous volume establishes visual and spatial connections between the different programs, allowing individual floors to become part of a coherent spatial sequence rather than remain isolated levels.
Ananti HQ establishes its own architectural order within a complex urban setting. Through the integration of interconnected programs, layered façades, and accessible outdoor spaces, the project proposes a headquarters that accommodates diverse activities while expressing the evolving identity of Ananti.
photos
Project information
- Name
- A Headquarter
- Location
- Gangnam-gu
- Completion
- 2023
- Status
- Completed
- Program
- Office
- Area
- 4,200 m²